RESPONSIBLE FOR METADATA DIEF (University of Modena and Reggio Emilia)
RESPONSIBLE AGENCY LEICAIT (Leica Geosystems SPA)
CURRENT STATION CONFIGURATION mops00ita_20220823.log
STATUS IN EPN included since 22-04-2007
LAST AVAILABLE DATA 29-05-2023
LAST RECEIVER LEICA GR30 (05-08-2022 to now)
SET TO TRACK GPS+GLO+GAL+BDS
LAST ANTENNA LEIAR10/NONE (14-04-2016 to now)
INDIVIDUAL CALIBRATION(S) none
DATA ROUTINELY ANALYSED BY ASI, BEK, BEV, BKG, IGE

The RINEX 2 data are no more submitted to the EPN data centres since 20-12-2021.

RINEX V2.11 - GPS+GLO+GAL
Daily
(data calendar)
Data centres Online Last data Availability Download
EPNCB (historical) 354/2021 N/A
BEV 353/2021 N/A
BKGE 354/2021 N/A
RINEX V3.04 - GPS+GLO+GAL+BDS
Daily
(data calendar)
Data centres Online Last data Availability Download
EPNCB (historical) 143/2023 78.57%
BEV 149/2023 100%
BKGE 149/2023 100%
Hourly
Data centres Online Last data Availability Latency
BEV 354/2021 (A) N/A 0%
BKGE 354/2021 (A) N/A 0%
Hourly
Data centres Online Last data Availability Latency
BEV 150/2023 (H) 100% 95.24%
BKGE 150/2023 (H) 100% 92.26%

Daily and Hourly Latency Plots

Recent RINEX file errors detected by BKG data centre: web page, API (JSON format)

BKG upload settings to other data centres.

Location

Pictures