RESPONSIBLE AGENCY DUT (Delft University of Technology)
RESPONSIBLE FOR METADATA DUT (Delft University of Technology)
CURRENT STATION CONFIGURATION wsrt00nld_20231207.log
STATUS IN EPN included since 20-07-1997
LAST AVAILABLE DATA 22-04-2024
LAST RECEIVER SEPT POLARX5 (17-04-2023 to now)
SET TO TRACK GPS+GLO+GAL+BDS+QZSS+IRNSS+SBAS
LAST ANTENNA LEIAR25.R4/LEIT (07-12-2023 to now)
INDIVIDUAL CALIBRATION(S)
  • LEIAR25.R4/LEIT (SN: 726840) from 2023-12-07 to now :
DATA ROUTINELY ANALYSED BY BKG, LPT, MUT, NKG, ROB
INCLUSION IN OTHER NETWORK(S) IGS, EPOS

The RINEX 2 data are no more submitted to the EPN data centres since 15-04-2020.

RINEX V2.11 - GPS+GLO
Daily
(data calendar)
Data centres Online Last data Availability Download
EPNCB (historical) 105/2020 N/A
BEV 023/2020 N/A
BKGI 105/2020 N/A
RINEX V3.05 - GPS+GLO+GAL+BDS+QZSS+IRNSS+SBAS
Daily
(data calendar)
Data centres Online Last data Availability Download
EPNCB (historical) 106/2024 75%
BEV 113/2024 100%
BKGI 113/2024 100%
Hourly

No recent data available

Hourly
Data centres Online Last data Availability Latency
BEV 114/2024 (F) 100% 100%
BKGI 114/2024 (F) 100% 100%

Daily and Hourly Latency Plots

Recent RINEX file errors detected by BKG data centre: web page, API (JSON format)

BKG upload settings to other data centres.

Location

Pictures